Direct Factory Manufacture 6*4 Tipper Trailer Dump Trailer for Saledirect Factory Manufacture 6*4 Tipper Trailer Dump Trailer for Sale

1.Solution parameters
 

size 13000mm*2550*3440
payload 60ton 
tare weight  7000kg
axle 3x13ton/14ton/16ton/20ton   brand can be opentional 
suspension  mechanical suspension/air suspension/american variety/germany type can be opentional
tire 11R22.5/12R22.5/eleven.00R20/twelve.00R20    brand can be opentional 
wheel rim 8.twenty five/9./eight./eight.5 
kingpin  2″/3.five”
I  beam  up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm:
material:Q345B/T700
landing gear  jost c200 /fuwa  two velocity 28ton 
flooring 3mm checkered plate
twist lock  Optional
spare tire carrier  two pcs 
device box 1
air wiring  doule air line 
electricity wiring 6 core wiring24v or 12v LED lamp
brake program wabco relay valvedrum braket30/thirty brake chamber 
paiting  full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2  coats of final paiting
colour  Optional
accessories  brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp

2.Normal Procedure

1)cutting  
use the plasma cutting equipment lower the steel to minor areas use for appropriate welding and splicing
 
2)welding  
following steel slicing method the up coming action is welding .this procedure the primary operate is beam welding .the best plate-bottom plate and the
middle  plate  will  be welding collectively .  this approach will be use submerged arc welding procedure.this sort of welding is very
particular .its completely employed in I beam welding .following this welding method other parts of the trailer will be use various welding way
for various metal-argon arc welding-electric arc welding-guide welding-gas welding and so on
 
3)blasting
this process is use for the first step of floor cleanness-tension aid-derusting prior to paiting .
 
4)electrophoresis coating  
this process use for far more detail area cleanness
 
five)epoxy zinc primer spray coating 
this procedure is the long lasting 1 prior to paiting .after this method the trailer an be paiting
 
six)assembly
right after all the process we have mationed .the final procedure of the trailer is assembly.this approach all the areas will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake technique and so on

seven)packing 
The last procedure is packing .all the trailer use distinct packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer

 

Direct Factory Manufacture 6*4 Tipper Trailer Dump Trailer for Saledirect Factory Manufacture 6*4 Tipper Trailer Dump Trailer for Sale