1.Product parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany variety can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./8./eight.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | 1 |
air wiring | doule air line |
electrical energy wiring | 6 main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma slicing device cut the steel to small elements use for suited welding and splicing
two)welding
after steel slicing procedure the following action is welding .this method the principal work is beam welding .the leading plate-bottom plate and the
middle plate will be welding with each other . this approach will be use submerged arc welding approach.this kind of welding is really
special .its completely utilised in I beam welding .soon after this welding method other areas of the trailer will be use various welding way
for distinct metal-argon arc welding-electrical arc welding-handbook welding-fuel welding and so on
three)blasting
this process is use for the very first phase of surface cleanness-anxiety reduction-derusting before paiting .
four)electrophoresis coating
this procedure use for much more detail floor cleanness
5)epoxy zinc primer spray coating
this approach is the lasting one ahead of paiting .following this process the trailer an be paiting
6)assembly
right after all the process we have mationed .the previous treatment of the trailer is assembly.this procedure all the areas will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake technique and so on
7)packing
The final procedure is packing .all the trailer use different packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer