one.Solution parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany sort can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/nine./8./eight.5 |
kingpin | 2″/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | one |
air wiring | doule air line |
electrical energy wiring | six core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma reducing device minimize the steel to little elements use for suited welding and splicing
two)welding
after steel slicing procedure the up coming stage is welding .this procedure the main operate is beam welding .the best plate-bottom plate and the
middle plate will be welding together . this approach will be use submerged arc welding process.this sort of welding is really
unique .its solely utilized in I beam welding .soon after this welding method other parts of the trailer will be use distinct welding way
for different metal-argon arc welding-electric arc welding-guide welding-fuel welding and so on
3)blasting
this approach is use for the initial step of area cleanness-tension reduction-derusting prior to paiting .
four)electrophoresis coating
this procedure use for a lot more detail floor cleanness
five)epoxy zinc primer spray coating
this procedure is the lasting one particular just before paiting .soon after this process the trailer an be paiting
6)assembly
soon after all the procedure we have mationed .the very last process of the trailer is assembly.this approach all the elements will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake method and so on
7)packing
The very last method is packing .all the trailer use various packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer