one.Merchandise parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany variety can be opentional |
tire | 11R22.5/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/9./8./eight.5 |
kingpin | 2″/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | one |
air wiring | doule air line |
electrical energy wiring | 6 core wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/thirty brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma cutting device lower the steel to minor elements use for ideal welding and splicing
2)welding
right after steel reducing method the up coming action is welding .this approach the major operate is beam welding .the best plate-base plate and the
middle plate will be welding with each other . this process will be use submerged arc welding process.this kind of welding is extremely
specific .its exclusively employed in I beam welding .following this welding procedure other areas of the trailer will be use different welding way
for distinct steel-argon arc welding-electrical arc welding-manual welding-fuel welding and so on
3)blasting
this method is use for the 1st action of surface area cleanness-stress aid-derusting just before paiting .
four)electrophoresis coating
this method use for more element surface area cleanness
5)epoxy zinc primer spray coating
this approach is the long lasting a single just before paiting .following this approach the trailer an be paiting
6)assembly
soon after all the approach we have mationed .the last treatment of the trailer is assembly.this procedure all the elements will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake program and so on
seven)packing
The previous process is packing .all the trailer use different packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer