one.Product parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany type can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/9./8./8.5 |
kingpin | two”/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | one |
air wiring | doule air line |
electrical energy wiring | 6 main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma slicing machine lower the metal to tiny parts use for suited welding and splicing
2)welding
soon after metal slicing method the subsequent step is welding .this process the primary operate is beam welding .the prime plate-bottom plate and the
middle plate will be welding jointly . this method will be use submerged arc welding approach.this variety of welding is really
unique .its completely utilised in I beam welding .following this welding method other parts of the trailer will be use distinct welding way
for diverse steel-argon arc welding-electric powered arc welding-guide welding-gasoline welding and so on
three)blasting
this procedure is use for the initial action of surface area cleanness-pressure relief-derusting before paiting .
4)electrophoresis coating
this procedure use for more detail floor cleanness
5)epoxy zinc primer spray coating
this procedure is the lasting 1 before paiting .following this approach the trailer an be paiting
6)assembly
soon after all the process we have mationed .the last treatment of the trailer is assembly.this process all the elements will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake program and so on
seven)packing
The very last process is packing .all the trailer use various packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer