one.Product parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany variety can be opentional |
tire | 11R22.five/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./eight./eight.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | 1 |
air wiring | doule air line |
electricity wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma chopping machine cut the steel to small elements use for appropriate welding and splicing
2)welding
after steel reducing approach the subsequent step is welding .this method the main operate is beam welding .the top plate-base plate and the
middle plate will be welding with each other . this approach will be use submerged arc welding method.this type of welding is really
special .its exclusively utilised in I beam welding .after this welding approach other elements of the trailer will be use different welding way
for diverse steel-argon arc welding-electric arc welding-manual welding-fuel welding and so on
three)blasting
this approach is use for the very first phase of surface area cleanness-stress relief-derusting before paiting .
4)electrophoresis coating
this procedure use for much more detail surface cleanness
5)epoxy zinc primer spray coating
this procedure is the lasting 1 ahead of paiting .after this approach the trailer an be paiting
6)assembly
after all the method we have mationed .the previous treatment of the trailer is assembly.this procedure all the areas will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on
7)packing
The last process is packing .all the trailer use diverse packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer