Manufacturing facility Price 30t-80t three Axle ten-20t Modest Machine Transportation Drawbar Flat Bed Reduced Bed Truck Semi Trailer for Sale
Principal Functionality
Merchandise Specification | ||||
1 | Variety | Semitrailer | ||
two | Product Name | Lower Bed Semitrailer | ||
three | Dimension | 12000x3000x1600mm | ||
four | Tare Bodyweight | 9200kg | ||
5 | Payload | 40t | ||
6
|
Operating System | Axles | FUWA , BPW, HUAJIN manufacturer,13t/16t/20t Great quality axles | |
Suspension | Tri-axle 10-pcs leaf spring suspension with equalizer beam (we can decide on the Air suspension depend on JCPTer need) |
|||
Tires | Linglong, Double Coin, Triangle manufacturer 11.00R20/8.25R20/12.00R22.five, 12unit | |||
seven | Ladder | Manually operated or JCPT sort | ||
8 | Braking Program | Dual lines pneumatic brake system, WABCO Emergency Relay Valve KORMEE Stomach muscles braking system |
||
nine | Body | Main Beam | Q345B steel,Height 500, upper 18mm, lower 18mm. Mid web 10mm |
|
Cross Beam | Mild Alloy Q235 | |||
10 | King Pin | Dimension: 50# (2”) or 90#(3.5”) Type: welded or assembled | ||
11 | Landing Gear | FUWA, JOST Brand Single side operation or double side operation, Static capacity 28Ton |
||
twelve | Electrical & Paint | Electrical | Rear light, rear reflector, turn indicative light, side reflector, fog lamp, number plate light | |
JCPTs & Reflectors | 24V, 7 lines | |||
Portray | zinc-prosperous primer and modified urethane topcoat as JCPTers’ options. | |||
Add-ons | Resource BOX (BOX ONLY)—Supplied WITH THE TRAILER TWO SPARE WHEEL HOLDER(WINCH),BUT NO SPARE TYRES |
I.The Application and the Technical Highlights:
—The lower bed semitrailers are mainly suitable for the MID/Long length transportation of mechanical equipment, large objects, freeway building tools, large tanks, electrical power plant tools or equipment, and all types of steel goods.
—The reduced mattress semitrailer can bed divide into flat bed minimal bed trailer, concave reduced bed trailer, tyres seem low bed trailer, tyres covered minimal mattress trailer. The concave low bed trailer structured with tyre appeared fashion, the height of the cargo’s carrying platform from floor is 900mm.-Lower platform tends to make the stable transportation.
—The chassis is ladder type,longitudinal beam segment is H-shaped. It has great rigidity and higher toughness.
— Higher Quality Body and higher-tensile metal for hefty loading ability
— BPW, FUWA or Certificated Chinese Axles
—Abs brake method
—WABCO Vehicle Control Method
—JOST ,FUWA or Chinese model parking leg and king pin
—Air and Mechanical Suspension
—Strengthen the Chassis Instructure
II.The Edge
***Body:using the superior assembly welded equipments to weld the room frame composition which fashioned by welded-type longitudinal beam (created of 16Mn steel plate) and the complete Run-through cross beam.Our think about the energy,stiffness and toughness of the frame and design the frame is strong adequate to carry the hefty cargo.
***Suspension: JCPTweight style.Higher-strength material with sturdy carrying potential, exceptional dress in resistance residence and overall performance balance and lengthy service existence.Wheel Monitor adjustable easily and properly, which safeguard the tires from abnormal wear.Handed strict bench tests and highway testing.
***Axle:Specially processed one-piece spindle of substantial quality lower alloy metal, which possesses powerful loading ability, long daily life, gentle excess weight and outstanding overall performance.Large machining precision of the braking system helps make the braking efficiency far more stable.
III.Sophisticated Procedure
~~~Layout Drawing: Ahead of creation, we will despatched the layout drawing to our JCPTer to validate the detail of the automobile. We hope we can offer the most ideal product to our JCPTer.
~~~Slicing and Welding: The I beam cutting adopt the Laptop Numerical Control Plasma Chopping Device. The I beam welding adopt the Gantry Primary Sill Welding Equipment.
~~~The Beam Welding: Principal beam and side beam all use I-formed beam, it can make sure the trailer far more durable.Reinforced rear plate can steer clear of the rear plate was broken absent when large duty equipment climbing the ramp of trailer.
~~~Floor Treatment: In order to take away the rust of the trailer human body, we use the sand blasting to retreat the floor of the trailer.
The trailer can have the stunning visual appeal,the painting will be coating evenly, agency adhension, gloss far more durable
~~~Painting: A single layer of the anti-rust painting, two layer of painting
~~~Test: We will take a look at the top quality of the trailer before shipping and delivery.
IV.The Detail of the Minimal Bed Trailer
V. Classification Of The Minimal Mattress Trailer
VI. Guarrantee For The Elements Of The Low Mattress Traielr:
ITEM NAME | Warranty | ITEM NAME | Warranty | |||
MAIN FRAME | Body | 1 YEAR | RUNNING GEAR | AXLE | 6 MONTHS | |
SUSPENSION | 6 MONTHS | AXLE BEARING | 3 MONTHS | |||
KING PIN | 1 YEAR | WHEEL HUB | 3 MONTHS | |||
BALANCE ARM | 3 MONTHS | |||||
ITEM NAME | Guarantee | ITEM NAME | Guarantee | |||
BRAKING DEVICE | BRAKE DRUM | 3 MONTHS | SUPPORT DEVICE | LXIHU (WEST LAKE) DIS. GEAR | 6 MONTHS | |
BRKE CHAMBER | 3 MONTHS | SPARE WHEEL CARRIER | 6 MONTHS | |||
AIR RESERVOIR | 6 MONTHS | |||||
ITEM NAME | Warranty | |||||
Other people | LEAF SPRING | 3 MONTHS | ||||
BRAKE CHAMBER DIAPHRAGM | 3 MONTHS | |||||
EMERGENCY RELAY VALVE | 3 MONTHS | |||||
BRAKE SHOE | 3 MONTHS | |||||
RELAY VALVE | 3 MONTHS |
VII. Dealing Procedure
1. You send us an inquiries on your wanted trailer via our speak to info.
two. We shall reply you in 12 several hours right after we received our inquiry.
3. We will negotiate the element of the trailer on your necessity.
4. Verified on the tech information.
5. Indicator agreement.
six.thirty% down payment or LC issuing.
seven. Manufacturing
8. The Manufacturig method with up to date information.
9. The Creation completement.
ten.Stability payment .
eleven.Set up Cargo and Customized Clearance
12. A/S services for 1 year.