1.Item parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany sort can be opentional |
tire | 11R22.five/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.25/9./8./eight.5 |
kingpin | 2″/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | 1 |
air wiring | doule air line |
electric power wiring | 6 main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/thirty brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma cutting equipment reduce the metal to minor parts use for suitable welding and splicing
2)welding
after metal reducing method the next action is welding .this procedure the primary operate is beam welding .the leading plate-base plate and the
middle plate will be welding jointly . this procedure will be use submerged arc welding process.this variety of welding is extremely
specific .its completely utilized in I beam welding .after this welding approach other areas of the trailer will be use different welding way
for diverse metal-argon arc welding-electric powered arc welding-handbook welding-gas welding and so on
3)blasting
this procedure is use for the very first stage of floor cleanness-anxiety relief-derusting just before paiting .
four)electrophoresis coating
this method use for much more detail area cleanness
five)epoxy zinc primer spray coating
this method is the lasting a single just before paiting .after this procedure the trailer an be paiting
six)assembly
following all the approach we have mationed .the very last treatment of the trailer is assembly.this process all the areas will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake technique and so on
seven)packing
The previous method is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer