1.Product parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany type can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/nine./eight./eight.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | one |
air wiring | doule air line |
electricity wiring | 6 main wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/thirty brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma cutting equipment reduce the metal to small parts use for ideal welding and splicing
2)welding
after metal chopping process the subsequent action is welding .this method the major work is beam welding .the top plate-bottom plate and the
middle plate will be welding collectively . this approach will be use submerged arc welding method.this variety of welding is very
specific .its exclusively employed in I beam welding .right after this welding process other parts of the trailer will be use distinct welding way
for distinct metal-argon arc welding-electric powered arc welding-guide welding-fuel welding and so on
three)blasting
this method is use for the very first step of floor cleanness-stress aid-derusting just before paiting .
four)electrophoresis coating
this process use for a lot more depth area cleanness
five)epoxy zinc primer spray coating
this process is the lasting one ahead of paiting .right after this procedure the trailer an be paiting
six)assembly
soon after all the approach we have mationed .the last method of the trailer is assembly.this method all the elements will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake method and so on
7)packing
The last approach is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer