one.Product parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany variety can be opentional |
tire | 11R22.five/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./8./eight.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | one |
air wiring | doule air line |
electrical power wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma chopping device lower the steel to small parts use for appropriate welding and splicing
two)welding
right after steel chopping procedure the following action is welding .this procedure the primary operate is beam welding .the top plate-base plate and the
middle plate will be welding together . this method will be use submerged arc welding process.this variety of welding is really
unique .its exclusively employed in I beam welding .following this welding process other elements of the trailer will be use distinct welding way
for different metal-argon arc welding-electric powered arc welding-handbook welding-gasoline welding and so on
3)blasting
this procedure is use for the initial stage of surface area cleanness-anxiety aid-derusting ahead of paiting .
four)electrophoresis coating
this procedure use for much more detail area cleanness
5)epoxy zinc primer spray coating
this process is the lasting 1 just before paiting .after this method the trailer an be paiting
six)assembly
following all the approach we have mationed .the last process of the trailer is assembly.this procedure all the areas will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake system and so on
seven)packing
The last method is packing .all the trailer use diverse packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer