one.Merchandise parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany sort can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./eight./8.5 |
kingpin | two”/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | one |
air wiring | doule air line |
electrical energy wiring | 6 core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma cutting equipment reduce the steel to little elements use for appropriate welding and splicing
2)welding
soon after metal slicing procedure the next stage is welding .this method the main work is beam welding .the top plate-bottom plate and the
middle plate will be welding with each other . this method will be use submerged arc welding process.this kind of welding is extremely
particular .its solely used in I beam welding .right after this welding approach other areas of the trailer will be use distinct welding way
for distinct steel-argon arc welding-electric powered arc welding-manual welding-fuel welding and so on
3)blasting
this method is use for the very first action of floor cleanness-pressure relief-derusting before paiting .
four)electrophoresis coating
this process use for a lot more depth floor cleanness
5)epoxy zinc primer spray coating
this approach is the long lasting one particular prior to paiting .soon after this method the trailer an be paiting
six)assembly
right after all the process we have mationed .the final procedure of the trailer is assembly.this approach all the elements will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake program and so on
7)packing
The last procedure is packing .all the trailer use different packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer