Guangli Brand New Cargo Box Van Trailer with Aluminum Flat Panel

Guangli Brand New Cargo Box Van Trailer with Aluminum Flat Panel

1.Solution parameters
 

size 13000mm*2550*3440
payload 60ton 
tare weight  7000kg
axle 3x13ton/14ton/16ton/20ton   brand can be opentional 
suspension  mechanical suspension/air suspension/american type/germany variety can be opentional
tire 11R22.5/12R22.5/eleven.00R20/twelve.00R20    brand can be opentional 
wheel rim 8.twenty five/9./8./eight.5 
kingpin  two”/three.five”
I  beam  up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm:
material:Q345B/T700
landing gear  jost c200 /fuwa  two pace 28ton 
floor 3mm checkered plate
twist lock  Optional
spare tire carrier  2 pcs 
tool box 1
air wiring  doule air line 
electrical energy wiring 6 main wiring24v or 12v LED lamp
brake program wabco relay valvedrum braket30/30 brake chamber 
paiting  total chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2  coats of closing paiting
colour  Optional
accessories  brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp

two.Normal Procedure

one)cutting  
use the plasma slicing equipment minimize the steel to tiny elements use for ideal welding and splicing
 
2)welding  
following metal cutting method the next stage is welding .this process the primary work is beam welding .the leading plate-bottom plate and the
middle  plate  will  be welding jointly .  this process will be use submerged arc welding approach.this variety of welding is very
particular .its completely employed in I beam welding .right after this welding procedure other elements of the trailer will be use diverse welding way
for diverse steel-argon arc welding-electrical arc welding-manual welding-fuel welding and so on
 
3)blasting
this process is use for the first step of surface area cleanness-tension reduction-derusting ahead of paiting .
 
four)electrophoresis coating  
this approach use for more detail surface area cleanness
 
5)epoxy zinc primer spray coating 
this approach is the long lasting one particular just before paiting .right after this process the trailer an be paiting
 
6)assembly
after all the method we have mationed .the very last method of the trailer is assembly.this method all the elements will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake program and so on

seven)packing 
The previous procedure is packing .all the trailer use distinct packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer

 

Guangli Brand New Cargo Box Van Trailer with Aluminum Flat Panel

Tags:

locking collar

As one of leading locking collar manufacturers, suppliers and exporters of products, We offer locking collar and many other products.

Please contact us for details.

Mail:sales@lockingcollar.com

Manufacturer supplier exporter of locking collar

Recent Posts