1.Solution parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany variety can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./8./eight.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | 1 |
air wiring | doule air line |
electrical energy wiring | 6 main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma slicing equipment minimize the steel to tiny elements use for ideal welding and splicing
2)welding
following metal cutting method the next stage is welding .this process the primary work is beam welding .the leading plate-bottom plate and the
middle plate will be welding jointly . this process will be use submerged arc welding approach.this variety of welding is very
particular .its completely employed in I beam welding .right after this welding procedure other elements of the trailer will be use diverse welding way
for diverse steel-argon arc welding-electrical arc welding-manual welding-fuel welding and so on
3)blasting
this process is use for the first step of surface area cleanness-tension reduction-derusting ahead of paiting .
four)electrophoresis coating
this approach use for more detail surface area cleanness
5)epoxy zinc primer spray coating
this approach is the long lasting one particular just before paiting .right after this process the trailer an be paiting
6)assembly
after all the method we have mationed .the very last method of the trailer is assembly.this method all the elements will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake program and so on
seven)packing
The previous procedure is packing .all the trailer use distinct packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer