one.Product parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany variety can be opentional |
tire | 11R22.five/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.25/nine./eight./eight.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | 1 |
air wiring | doule air line |
electrical energy wiring | six main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma reducing equipment cut the steel to minor components use for ideal welding and splicing
two)welding
right after steel reducing approach the subsequent phase is welding .this procedure the major function is beam welding .the best plate-bottom plate and the
middle plate will be welding together . this approach will be use submerged arc welding process.this sort of welding is very
unique .its solely utilised in I beam welding .soon after this welding procedure other elements of the trailer will be use diverse welding way
for distinct steel-argon arc welding-electrical arc welding-handbook welding-fuel welding and so on
3)blasting
this approach is use for the very first step of area cleanness-tension reduction-derusting ahead of paiting .
4)electrophoresis coating
this method use for more detail surface area cleanness
five)epoxy zinc primer spray coating
this approach is the long lasting one before paiting .right after this approach the trailer an be paiting
6)assembly
right after all the method we have mationed .the very last method of the trailer is assembly.this approach all the elements will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake technique and so on
7)packing
The last method is packing .all the trailer use various packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer