one.Solution parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany variety can be opentional |
tire | 11R22.5/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./eight./eight.5 |
kingpin | two”/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | one |
air wiring | doule air line |
electrical energy wiring | 6 main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma reducing machine minimize the metal to small parts use for suited welding and splicing
2)welding
following steel cutting method the next step is welding .this method the main perform is beam welding .the best plate-bottom plate and the
middle plate will be welding jointly . this process will be use submerged arc welding procedure.this kind of welding is very
particular .its exclusively used in I beam welding .right after this welding procedure other components of the trailer will be use various welding way
for different metal-argon arc welding-electric powered arc welding-handbook welding-gas welding and so on
three)blasting
this process is use for the first stage of area cleanness-pressure relief-derusting prior to paiting .
four)electrophoresis coating
this process use for more element surface cleanness
five)epoxy zinc primer spray coating
this method is the lasting one just before paiting .following this process the trailer an be paiting
6)assembly
right after all the process we have mationed .the last treatment of the trailer is assembly.this procedure all the parts will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake method and so on
7)packing
The last procedure is packing .all the trailer use different packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer