Heavy Duty Low Bed 70t Transport Heavy Machines Dolly Installed Semi Trailer

1.Merchandise parameters
 

dimension 13000mm*2550*3440
payload 60ton 
tare weight  7000kg
axle 3x13ton/14ton/16ton/20ton   brand can be opentional 
suspension  mechanical suspension/air suspension/american sort/germany type can be opentional
tire 11R22.five/12R22.5/11.00R20/12.00R20    brand can be opentional 
wheel rim 8.25/9./eight./eight.5 
kingpin  two”/three.5″
I  beam  up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm:
materials:Q345B/T700
landing gear  jost c200 /fuwa  two velocity 28ton 
ground 3mm checkered plate
twist lock  Optional
spare tire carrier  2 pcs 
tool box 1
air wiring  doule air line 
electrical energy wiring 6 main wiring24v or 12v LED lamp
brake system wabco relay valvedrum braket30/thirty brake chamber 
paiting  complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2  coats of closing paiting
colour  Optional
accessories  brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp

two.Normal Procedure

1)cutting  
use the plasma cutting device cut the steel to minor parts use for suitable welding and splicing
 
2)welding  
following metal chopping procedure the up coming stage is welding .this process the principal work is beam welding .the prime plate-base plate and the
middle  plate  will  be welding together .  this process will be use submerged arc welding approach.this kind of welding is really
unique .its exclusively utilized in I beam welding .after this welding process other parts of the trailer will be use different welding way
for different steel-argon arc welding-electrical arc welding-handbook welding-gas welding and so on
 
3)blasting
this approach is use for the very first step of surface area cleanness-tension aid-derusting ahead of paiting .
 
four)electrophoresis coating  
this procedure use for much more detail area cleanness
 
5)epoxy zinc primer spray coating 
this procedure is the lasting 1 before paiting .right after this procedure the trailer an be paiting
 
6)assembly
following all the approach we have mationed .the last treatment of the trailer is assembly.this approach all the elements will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake technique and so on

seven)packing 
The final process is packing .all the trailer use various packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer

 

Heavy Duty Low Bed 70t Transport Heavy Machines Dolly Installed Semi Trailer