one.Item parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany type can be opentional |
tire | 11R22.five/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./eight./eight.5 |
kingpin | two”/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | one |
air wiring | doule air line |
electrical energy wiring | six main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma reducing device lower the metal to tiny areas use for appropriate welding and splicing
2)welding
soon after steel cutting approach the next stage is welding .this process the principal operate is beam welding .the top plate-bottom plate and the
middle plate will be welding jointly . this method will be use submerged arc welding approach.this variety of welding is really
specific .its exclusively employed in I beam welding .soon after this welding approach other components of the trailer will be use different welding way
for different metal-argon arc welding-electrical arc welding-guide welding-gas welding and so on
3)blasting
this approach is use for the first phase of surface area cleanness-pressure aid-derusting just before paiting .
four)electrophoresis coating
this procedure use for more depth surface area cleanness
5)epoxy zinc primer spray coating
this process is the long lasting a single before paiting .soon after this approach the trailer an be paiting
six)assembly
after all the process we have mationed .the final procedure of the trailer is assembly.this process all the components will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake program and so on
7)packing
The very last method is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer