one.Product parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany type can be opentional |
tire | 11R22.five/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./eight./eight.5 |
kingpin | 2″/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | 1 |
air wiring | doule air line |
electrical power wiring | 6 core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma slicing device cut the steel to tiny elements use for suited welding and splicing
2)welding
right after metal chopping approach the following phase is welding .this approach the principal work is beam welding .the best plate-base plate and the
middle plate will be welding collectively . this procedure will be use submerged arc welding process.this kind of welding is very
particular .its completely utilized in I beam welding .following this welding process other elements of the trailer will be use diverse welding way
for distinct metal-argon arc welding-electrical arc welding-manual welding-gasoline welding and so on
3)blasting
this procedure is use for the first stage of surface area cleanness-pressure reduction-derusting before paiting .
4)electrophoresis coating
this procedure use for a lot more element surface area cleanness
five)epoxy zinc primer spray coating
this approach is the lasting 1 before paiting .following this procedure the trailer an be paiting
6)assembly
following all the procedure we have mationed .the previous process of the trailer is assembly.this method all the elements will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake program and so on
7)packing
The very last procedure is packing .all the trailer use diverse packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer