1.Solution parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany kind can be opentional |
tire | 11R22.5/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./eight./8.5 |
kingpin | 2″/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | one |
air wiring | doule air line |
electric power wiring | six main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma cutting equipment minimize the steel to small areas use for appropriate welding and splicing
two)welding
following metal chopping procedure the following phase is welding .this method the major perform is beam welding .the top plate-base plate and the
middle plate will be welding jointly . this process will be use submerged arc welding method.this type of welding is extremely
special .its solely utilised in I beam welding .following this welding procedure other areas of the trailer will be use distinct welding way
for distinct metal-argon arc welding-electrical arc welding-guide welding-fuel welding and so on
three)blasting
this method is use for the initial phase of surface area cleanness-stress relief-derusting prior to paiting .
four)electrophoresis coating
this procedure use for far more depth surface area cleanness
five)epoxy zinc primer spray coating
this approach is the lasting one ahead of paiting .following this procedure the trailer an be paiting
6)assembly
right after all the approach we have mationed .the very last treatment of the trailer is assembly.this procedure all the elements will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake technique and so on
7)packing
The very last method is packing .all the trailer use diverse packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer