1.Solution parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany type can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./eight./8.5 |
kingpin | 2″/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | one |
air wiring | doule air line |
electric power wiring | six main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma reducing device lower the metal to tiny components use for suited welding and splicing
2)welding
soon after steel cutting process the subsequent step is welding .this method the main perform is beam welding .the prime plate-base plate and the
middle plate will be welding with each other . this method will be use submerged arc welding approach.this variety of welding is very
particular .its exclusively utilised in I beam welding .right after this welding method other areas of the trailer will be use various welding way
for different steel-argon arc welding-electric powered arc welding-handbook welding-fuel welding and so on
three)blasting
this approach is use for the very first step of area cleanness-anxiety reduction-derusting ahead of paiting .
four)electrophoresis coating
this method use for a lot more element surface cleanness
5)epoxy zinc primer spray coating
this procedure is the lasting a single just before paiting .following this process the trailer an be paiting
six)assembly
right after all the method we have mationed .the very last method of the trailer is assembly.this method all the parts will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake program and so on
seven)packing
The final approach is packing .all the trailer use diverse packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer