1.Item parameters
 

measurement 13000mm*2550*3440
payload 60ton 
tare weight  7000kg
axle 3x13ton/14ton/16ton/20ton   brand can be opentional 
suspension  mechanical suspension/air suspension/american variety/germany sort can be opentional
tire 11R22.five/12R22.5/eleven.00R20/twelve.00R20    brand can be opentional 
wheel rim 8.twenty five/9./8./eight.5 
kingpin  two”/three.five”
I  beam  up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm:
materials:Q345B/T700
landing gear  jost c200 /fuwa  two pace 28ton 
floor 3mm checkered plate
twist lock  Optional
spare tire carrier  two pcs 
device box 1
air wiring  doule air line 
electricity wiring 6 core wiring24v or 12v LED lamp
brake program wabco relay valvedrum braket30/30 brake chamber 
paiting  complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2  coats of last paiting
colour  Optional
accessories  brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp

two.Normal Procedure

one)cutting  
use the plasma slicing equipment reduce the steel to small parts use for ideal welding and splicing
 
two)welding  
right after metal cutting process the subsequent phase is welding .this approach the main work is beam welding .the prime plate-bottom plate and the
middle  plate  will  be welding jointly .  this approach will be use submerged arc welding process.this kind of welding is very
specific .its completely utilised in I beam welding .right after this welding procedure other areas of the trailer will be use distinct welding way
for distinct steel-argon arc welding-electric arc welding-manual welding-gas welding and so on
 
3)blasting
this process is use for the initial step of surface area cleanness-stress relief-derusting prior to paiting .
 
4)electrophoresis coating  
this process use for a lot more detail surface area cleanness
 
5)epoxy zinc primer spray coating 
this approach is the long lasting one just before paiting .following this process the trailer an be paiting
 
six)assembly
right after all the method we have mationed .the last procedure of the trailer is assembly.this method all the components will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake system and so on

seven)packing 
The last procedure is packing .all the trailer use various packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer

 