1.Product parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany kind can be opentional |
tire | 11R22.five/12R22.5/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/9./8./8.5 |
kingpin | two”/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | 1 |
air wiring | doule air line |
electrical power wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma cutting equipment cut the metal to little elements use for appropriate welding and splicing
two)welding
right after steel chopping process the subsequent phase is welding .this procedure the primary work is beam welding .the best plate-bottom plate and the
middle plate will be welding with each other . this procedure will be use submerged arc welding method.this type of welding is extremely
unique .its exclusively used in I beam welding .right after this welding process other elements of the trailer will be use various welding way
for various steel-argon arc welding-electric powered arc welding-handbook welding-gas welding and so on
3)blasting
this method is use for the 1st step of floor cleanness-tension relief-derusting prior to paiting .
four)electrophoresis coating
this method use for far more element surface cleanness
5)epoxy zinc primer spray coating
this process is the long lasting one particular just before paiting .right after this procedure the trailer an be paiting
six)assembly
right after all the process we have mationed .the final process of the trailer is assembly.this process all the areas will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake program and so on
7)packing
The very last procedure is packing .all the trailer use distinct packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer