1.Product parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany sort can be opentional |
tire | 11R22.five/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./eight./eight.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | 1 |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma slicing equipment lower the metal to little components use for suited welding and splicing
2)welding
following steel slicing method the up coming stage is welding .this process the principal operate is beam welding .the leading plate-base plate and the
middle plate will be welding together . this method will be use submerged arc welding approach.this variety of welding is really
specific .its completely utilized in I beam welding .soon after this welding process other elements of the trailer will be use distinct welding way
for different steel-argon arc welding-electrical arc welding-handbook welding-gas welding and so on
3)blasting
this approach is use for the first action of surface area cleanness-anxiety reduction-derusting prior to paiting .
4)electrophoresis coating
this process use for more detail surface cleanness
5)epoxy zinc primer spray coating
this method is the lasting one particular ahead of paiting .following this approach the trailer an be paiting
6)assembly
right after all the approach we have mationed .the final procedure of the trailer is assembly.this method all the areas will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake technique and so on
7)packing
The final approach is packing .all the trailer use different packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer