1.Product parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany kind can be opentional |
tire | 11R22.5/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./eight./eight.5 |
kingpin | 2″/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | 1 |
air wiring | doule air line |
electricity wiring | 6 main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma cutting machine lower the metal to minor parts use for suited welding and splicing
two)welding
following steel chopping procedure the up coming stage is welding .this method the major work is beam welding .the top plate-bottom plate and the
middle plate will be welding jointly . this procedure will be use submerged arc welding method.this sort of welding is extremely
particular .its exclusively used in I beam welding .soon after this welding method other elements of the trailer will be use distinct welding way
for various steel-argon arc welding-electric arc welding-guide welding-fuel welding and so on
three)blasting
this procedure is use for the 1st action of surface cleanness-stress reduction-derusting just before paiting .
4)electrophoresis coating
this method use for far more depth surface cleanness
5)epoxy zinc primer spray coating
this method is the lasting one particular ahead of paiting .following this method the trailer an be paiting
six)assembly
following all the process we have mationed .the previous process of the trailer is assembly.this process all the parts will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake system and so on
7)packing
The very last approach is packing .all the trailer use various packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer