one.Solution parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany sort can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./8./eight.5 |
kingpin | two”/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | one |
air wiring | doule air line |
electrical energy wiring | six main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/thirty brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma reducing equipment reduce the metal to tiny parts use for appropriate welding and splicing
2)welding
after steel chopping method the next step is welding .this process the major function is beam welding .the prime plate-bottom plate and the
middle plate will be welding jointly . this procedure will be use submerged arc welding approach.this variety of welding is extremely
particular .its exclusively utilized in I beam welding .following this welding approach other elements of the trailer will be use distinct welding way
for diverse steel-argon arc welding-electric arc welding-guide welding-fuel welding and so on
three)blasting
this approach is use for the 1st stage of surface area cleanness-stress relief-derusting before paiting .
4)electrophoresis coating
this method use for far more depth surface area cleanness
five)epoxy zinc primer spray coating
this method is the long lasting 1 ahead of paiting .soon after this process the trailer an be paiting
6)assembly
after all the procedure we have mationed .the last procedure of the trailer is assembly.this method all the components will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake program and so on
7)packing
The very last process is packing .all the trailer use various packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer