1.Item parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany kind can be opentional |
tire | 11R22.5/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./eight./8.5 |
kingpin | 2″/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | 1 |
air wiring | doule air line |
electrical power wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma chopping machine reduce the metal to little areas use for suited welding and splicing
2)welding
after metal reducing process the up coming stage is welding .this approach the primary perform is beam welding .the top plate-base plate and the
middle plate will be welding jointly . this process will be use submerged arc welding approach.this sort of welding is really
special .its exclusively employed in I beam welding .soon after this welding procedure other components of the trailer will be use distinct welding way
for diverse steel-argon arc welding-electric powered arc welding-handbook welding-fuel welding and so on
three)blasting
this approach is use for the 1st step of area cleanness-anxiety reduction-derusting ahead of paiting .
four)electrophoresis coating
this approach use for much more depth area cleanness
five)epoxy zinc primer spray coating
this process is the long lasting 1 ahead of paiting .soon after this method the trailer an be paiting
6)assembly
right after all the process we have mationed .the very last method of the trailer is assembly.this approach all the elements will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on
7)packing
The final procedure is packing .all the trailer use various packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer