1.Item parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany variety can be opentional |
tire | 11R22.five/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.25/nine./8./8.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | one |
air wiring | doule air line |
electrical energy wiring | six main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/thirty brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma cutting machine lower the steel to small elements use for suitable welding and splicing
2)welding
right after metal slicing process the next stage is welding .this procedure the main work is beam welding .the leading plate-bottom plate and the
middle plate will be welding together . this method will be use submerged arc welding procedure.this sort of welding is really
special .its completely used in I beam welding .right after this welding process other parts of the trailer will be use different welding way
for distinct steel-argon arc welding-electrical arc welding-manual welding-fuel welding and so on
3)blasting
this method is use for the initial stage of floor cleanness-stress reduction-derusting prior to paiting .
4)electrophoresis coating
this method use for more detail surface cleanness
5)epoxy zinc primer spray coating
this procedure is the lasting one particular ahead of paiting .right after this procedure the trailer an be paiting
six)assembly
right after all the process we have mationed .the last treatment of the trailer is assembly.this process all the areas will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on
seven)packing
The very last procedure is packing .all the trailer use distinct packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer