1.Product parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany sort can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.25/9./8./eight.5 |
kingpin | 2″/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | 1 |
air wiring | doule air line |
electrical power wiring | 6 main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma chopping machine minimize the metal to little components use for suitable welding and splicing
two)welding
right after metal reducing procedure the subsequent step is welding .this procedure the main operate is beam welding .the top plate-base plate and the
middle plate will be welding collectively . this method will be use submerged arc welding process.this sort of welding is really
particular .its solely utilised in I beam welding .soon after this welding approach other components of the trailer will be use distinct welding way
for distinct metal-argon arc welding-electric arc welding-handbook welding-gasoline welding and so on
three)blasting
this approach is use for the 1st action of surface cleanness-stress reduction-derusting before paiting .
four)electrophoresis coating
this approach use for much more element surface cleanness
5)epoxy zinc primer spray coating
this approach is the lasting one particular ahead of paiting .after this method the trailer an be paiting
six)assembly
soon after all the approach we have mationed .the last procedure of the trailer is assembly.this method all the parts will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake program and so on
7)packing
The previous procedure is packing .all the trailer use various packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer