one.Product parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany type can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/nine./eight./eight.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
device box | one |
air wiring | doule air line |
electric power wiring | six main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/thirty brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma slicing equipment reduce the steel to minor areas use for suited welding and splicing
two)welding
right after steel chopping approach the subsequent phase is welding .this procedure the primary operate is beam welding .the leading plate-base plate and the
middle plate will be welding jointly . this method will be use submerged arc welding method.this sort of welding is extremely
specific .its exclusively used in I beam welding .soon after this welding method other parts of the trailer will be use various welding way
for different steel-argon arc welding-electric powered arc welding-handbook welding-gas welding and so on
3)blasting
this approach is use for the first action of area cleanness-pressure relief-derusting prior to paiting .
four)electrophoresis coating
this process use for far more element surface cleanness
5)epoxy zinc primer spray coating
this process is the long lasting one just before paiting .right after this process the trailer an be paiting
six)assembly
following all the method we have mationed .the previous process of the trailer is assembly.this approach all the parts will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake technique and so on
7)packing
The very last process is packing .all the trailer use different packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer