1.Item parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany type can be opentional |
tire | 11R22.five/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.25/nine./8./8.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | one |
air wiring | doule air line |
electric power wiring | 6 main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma chopping machine reduce the steel to tiny parts use for ideal welding and splicing
two)welding
after metal reducing approach the next action is welding .this process the principal work is beam welding .the top plate-bottom plate and the
middle plate will be welding jointly . this method will be use submerged arc welding method.this sort of welding is really
special .its completely used in I beam welding .following this welding process other areas of the trailer will be use distinct welding way
for diverse metal-argon arc welding-electric powered arc welding-handbook welding-gasoline welding and so on
three)blasting
this process is use for the very first step of surface cleanness-tension reduction-derusting before paiting .
4)electrophoresis coating
this procedure use for a lot more depth surface area cleanness
5)epoxy zinc primer spray coating
this procedure is the lasting 1 before paiting .soon after this procedure the trailer an be paiting
6)assembly
after all the procedure we have mationed .the very last treatment of the trailer is assembly.this procedure all the elements will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake system and so on
7)packing
The final procedure is packing .all the trailer use various packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer