1.Merchandise parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany kind can be opentional |
tire | 11R22.five/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./8./eight.5 |
kingpin | 2″/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | 1 |
air wiring | doule air line |
electricity wiring | 6 core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma slicing equipment lower the metal to little areas use for suitable welding and splicing
two)welding
following metal reducing method the subsequent action is welding .this process the major function is beam welding .the prime plate-bottom plate and the
middle plate will be welding with each other . this process will be use submerged arc welding method.this variety of welding is really
unique .its solely used in I beam welding .after this welding approach other components of the trailer will be use different welding way
for distinct metal-argon arc welding-electrical arc welding-guide welding-gasoline welding and so on
three)blasting
this approach is use for the first phase of surface cleanness-anxiety aid-derusting just before paiting .
4)electrophoresis coating
this process use for much more detail area cleanness
five)epoxy zinc primer spray coating
this process is the long lasting one ahead of paiting .following this process the trailer an be paiting
six)assembly
following all the process we have mationed .the very last process of the trailer is assembly.this procedure all the areas will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake technique and so on
seven)packing
The very last procedure is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer