one.Solution parameters
 

dimension 13000mm*2550*3440
payload 60ton 
tare weight  7000kg
axle 3x13ton/14ton/16ton/20ton   brand can be opentional 
suspension  mechanical suspension/air suspension/american sort/germany variety can be opentional
tire 11R22.five/12R22.five/11.00R20/twelve.00R20    brand can be opentional 
wheel rim 8.25/9./eight./8.5 
kingpin  2″/3.5″
I  beam  up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm:
substance:Q345B/T700
landing gear  jost c200 /fuwa  two velocity 28ton 
flooring 3mm checkered plate
twist lock  Optional
spare tire carrier  2 pcs 
device box one
air wiring  doule air line 
electricity wiring six main wiring24v or 12v LED lamp
brake system wabco relay valvedrum braket30/30 brake chamber 
paiting  total chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2  coats of ultimate paiting
colour  Optional
accessories  brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp

two.Normal Procedure

1)cutting  
use the plasma reducing machine lower the metal to small components use for ideal welding and splicing
 
2)welding  
right after metal chopping procedure the following action is welding .this approach the major perform is beam welding .the best plate-base plate and the
middle  plate  will  be welding together .  this process will be use submerged arc welding method.this type of welding is extremely
specific .its solely used in I beam welding .right after this welding approach other areas of the trailer will be use distinct welding way
for distinct steel-argon arc welding-electrical arc welding-manual welding-fuel welding and so on
 
3)blasting
this procedure is use for the first phase of floor cleanness-anxiety reduction-derusting prior to paiting .
 
four)electrophoresis coating  
this method use for far more depth floor cleanness
 
5)epoxy zinc primer spray coating 
this process is the long lasting one prior to paiting .following this process the trailer an be paiting
 
6)assembly
following all the process we have mationed .the final method of the trailer is assembly.this procedure all the components will be assemly .it including tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake program and so on

seven)packing 
The previous procedure is packing .all the trailer use distinct packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer

 