1.Solution parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany type can be opentional |
tire | 11R22.5/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./eight./8.5 |
kingpin | 2″/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | 1 |
air wiring | doule air line |
electric power wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma reducing equipment minimize the steel to tiny components use for suitable welding and splicing
two)welding
right after steel cutting process the following action is welding .this approach the main function is beam welding .the prime plate-base plate and the
middle plate will be welding jointly . this process will be use submerged arc welding approach.this kind of welding is quite
specific .its completely utilised in I beam welding .after this welding process other parts of the trailer will be use different welding way
for various steel-argon arc welding-electric powered arc welding-manual welding-gas welding and so on
3)blasting
this approach is use for the first action of surface cleanness-stress aid-derusting just before paiting .
4)electrophoresis coating
this method use for more depth area cleanness
five)epoxy zinc primer spray coating
this procedure is the lasting a single before paiting .following this procedure the trailer an be paiting
6)assembly
right after all the method we have mationed .the previous process of the trailer is assembly.this method all the elements will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake program and so on
7)packing
The previous method is packing .all the trailer use diverse packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer