one.Product parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany type can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/9./eight./8.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | one |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma slicing machine minimize the metal to small areas use for suitable welding and splicing
two)welding
after steel slicing procedure the following stage is welding .this procedure the primary operate is beam welding .the top plate-bottom plate and the
middle plate will be welding with each other . this method will be use submerged arc welding process.this kind of welding is very
special .its solely employed in I beam welding .right after this welding procedure other components of the trailer will be use different welding way
for diverse metal-argon arc welding-electric powered arc welding-guide welding-gas welding and so on
3)blasting
this approach is use for the initial stage of surface cleanness-pressure aid-derusting before paiting .
four)electrophoresis coating
this approach use for a lot more depth surface area cleanness
5)epoxy zinc primer spray coating
this method is the long lasting 1 ahead of paiting .after this procedure the trailer an be paiting
6)assembly
soon after all the procedure we have mationed .the final procedure of the trailer is assembly.this approach all the components will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake method and so on
seven)packing
The last procedure is packing .all the trailer use different packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer