one.Product parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany variety can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./8./8.5 |
kingpin | 2″/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | one |
air wiring | doule air line |
electrical energy wiring | 6 main wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/30 brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma chopping machine cut the steel to little components use for suited welding and splicing
2)welding
right after metal chopping procedure the subsequent step is welding .this method the major perform is beam welding .the prime plate-base plate and the
middle plate will be welding together . this method will be use submerged arc welding method.this kind of welding is extremely
special .its solely utilised in I beam welding .following this welding procedure other areas of the trailer will be use various welding way
for diverse metal-argon arc welding-electrical arc welding-guide welding-fuel welding and so on
3)blasting
this approach is use for the first step of floor cleanness-anxiety relief-derusting just before paiting .
4)electrophoresis coating
this approach use for far more detail floor cleanness
5)epoxy zinc primer spray coating
this approach is the lasting 1 just before paiting .soon after this approach the trailer an be paiting
six)assembly
soon after all the approach we have mationed .the previous process of the trailer is assembly.this approach all the components will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake technique and so on
seven)packing
The final approach is packing .all the trailer use various packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer