1.Merchandise parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany kind can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./8./eight.5 |
kingpin | two”/3.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | one |
air wiring | doule air line |
electrical power wiring | 6 core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma cutting equipment reduce the steel to little components use for suitable welding and splicing
two)welding
soon after metal cutting method the following phase is welding .this method the main perform is beam welding .the best plate-bottom plate and the
middle plate will be welding with each other . this approach will be use submerged arc welding approach.this kind of welding is quite
specific .its solely employed in I beam welding .soon after this welding procedure other parts of the trailer will be use distinct welding way
for different metal-argon arc welding-electric powered arc welding-handbook welding-fuel welding and so on
three)blasting
this method is use for the first action of surface area cleanness-anxiety reduction-derusting before paiting .
four)electrophoresis coating
this approach use for far more element floor cleanness
5)epoxy zinc primer spray coating
this process is the long lasting one particular before paiting .soon after this procedure the trailer an be paiting
six)assembly
right after all the approach we have mationed .the last procedure of the trailer is assembly.this approach all the elements will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake technique and so on
seven)packing
The final process is packing .all the trailer use diverse packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer