1.Merchandise parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american variety/germany type can be opentional |
tire | 11R22.5/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/9./eight./8.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | 1 |
air wiring | doule air line |
electric power wiring | six core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma cutting device reduce the metal to tiny parts use for ideal welding and splicing
2)welding
right after metal slicing method the up coming step is welding .this method the principal operate is beam welding .the top plate-base plate and the
middle plate will be welding together . this approach will be use submerged arc welding approach.this variety of welding is quite
specific .its exclusively used in I beam welding .after this welding procedure other areas of the trailer will be use various welding way
for distinct steel-argon arc welding-electrical arc welding-handbook welding-gasoline welding and so on
3)blasting
this method is use for the very first stage of surface cleanness-pressure aid-derusting ahead of paiting .
four)electrophoresis coating
this process use for a lot more detail surface area cleanness
5)epoxy zinc primer spray coating
this approach is the long lasting 1 ahead of paiting .following this approach the trailer an be paiting
six)assembly
following all the method we have mationed .the last procedure of the trailer is assembly.this process all the areas will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on
seven)packing
The final procedure is packing .all the trailer use distinct packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer