one.Product parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany variety can be opentional |
tire | 11R22.5/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./eight./eight.5 |
kingpin | two”/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | 1 |
air wiring | doule air line |
electrical energy wiring | six main wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma cutting machine lower the metal to minor elements use for appropriate welding and splicing
2)welding
following steel cutting process the subsequent stage is welding .this approach the principal function is beam welding .the top plate-base plate and the
middle plate will be welding with each other . this method will be use submerged arc welding process.this kind of welding is extremely
specific .its solely employed in I beam welding .right after this welding process other elements of the trailer will be use various welding way
for diverse steel-argon arc welding-electrical arc welding-guide welding-fuel welding and so on
3)blasting
this process is use for the 1st stage of surface cleanness-stress reduction-derusting prior to paiting .
four)electrophoresis coating
this method use for a lot more detail floor cleanness
5)epoxy zinc primer spray coating
this approach is the lasting a single just before paiting .right after this procedure the trailer an be paiting
6)assembly
following all the approach we have mationed .the previous procedure of the trailer is assembly.this process all the components will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake system and so on
7)packing
The final process is packing .all the trailer use distinct packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer