one.Product parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany variety can be opentional |
tire | 11R22.5/12R22.5/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | 8.twenty five/nine./8./eight.5 |
kingpin | two”/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | 1 |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma chopping device cut the metal to little parts use for suitable welding and splicing
two)welding
right after steel reducing procedure the up coming action is welding .this process the main operate is beam welding .the top plate-bottom plate and the
middle plate will be welding together . this procedure will be use submerged arc welding method.this type of welding is extremely
special .its exclusively employed in I beam welding .after this welding process other areas of the trailer will be use different welding way
for various steel-argon arc welding-electrical arc welding-manual welding-gasoline welding and so on
3)blasting
this method is use for the very first step of area cleanness-anxiety aid-derusting just before paiting .
4)electrophoresis coating
this procedure use for much more depth floor cleanness
5)epoxy zinc primer spray coating
this procedure is the lasting one ahead of paiting .after this method the trailer an be paiting
six)assembly
right after all the process we have mationed .the final procedure of the trailer is assembly.this method all the parts will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake system and so on
7)packing
The last procedure is packing .all the trailer use different packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer