1.Item parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany type can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/nine./8./8.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | one |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of final paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma slicing equipment minimize the metal to little elements use for appropriate welding and splicing
2)welding
after steel reducing process the following step is welding .this process the primary operate is beam welding .the prime plate-bottom plate and the
middle plate will be welding jointly . this process will be use submerged arc welding process.this kind of welding is really
specific .its solely used in I beam welding .right after this welding procedure other elements of the trailer will be use diverse welding way
for diverse steel-argon arc welding-electrical arc welding-handbook welding-gas welding and so on
three)blasting
this approach is use for the very first step of surface area cleanness-pressure relief-derusting prior to paiting .
four)electrophoresis coating
this method use for a lot more detail floor cleanness
five)epoxy zinc primer spray coating
this approach is the lasting one particular before paiting .following this procedure the trailer an be paiting
six)assembly
soon after all the procedure we have mationed .the final method of the trailer is assembly.this approach all the areas will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake method and so on
7)packing
The last procedure is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer