1.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany sort can be opentional |
tire | 11R22.five/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./8./eight.5 |
kingpin | 2″/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
device box | 1 |
air wiring | doule air line |
electrical power wiring | 6 core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma chopping equipment lower the steel to minor components use for suited welding and splicing
two)welding
right after steel slicing process the up coming phase is welding .this procedure the primary work is beam welding .the prime plate-base plate and the
middle plate will be welding collectively . this method will be use submerged arc welding method.this variety of welding is extremely
particular .its completely used in I beam welding .soon after this welding procedure other parts of the trailer will be use distinct welding way
for different steel-argon arc welding-electrical arc welding-handbook welding-gasoline welding and so on
three)blasting
this method is use for the very first phase of surface area cleanness-pressure aid-derusting before paiting .
4)electrophoresis coating
this method use for more detail area cleanness
five)epoxy zinc primer spray coating
this procedure is the long lasting 1 before paiting .soon after this process the trailer an be paiting
6)assembly
following all the method we have mationed .the final method of the trailer is assembly.this procedure all the areas will be assemly .it such as tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake program and so on
7)packing
The previous procedure is packing .all the trailer use different packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer