1.Item parameters
measurement | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany sort can be opentional |
tire | 11R22.5/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/9./eight./eight.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
resource box | one |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/thirty brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma cutting device minimize the metal to little areas use for suited welding and splicing
2)welding
following steel cutting process the next phase is welding .this method the major perform is beam welding .the prime plate-base plate and the
middle plate will be welding collectively . this procedure will be use submerged arc welding approach.this type of welding is quite
special .its exclusively utilized in I beam welding .right after this welding procedure other elements of the trailer will be use distinct welding way
for diverse steel-argon arc welding-electric arc welding-manual welding-gas welding and so on
three)blasting
this procedure is use for the 1st phase of area cleanness-stress reduction-derusting ahead of paiting .
4)electrophoresis coating
this process use for a lot more element area cleanness
5)epoxy zinc primer spray coating
this process is the lasting one particular just before paiting .right after this procedure the trailer an be paiting
6)assembly
right after all the process we have mationed .the final treatment of the trailer is assembly.this process all the elements will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake program and so on
seven)packing
The previous approach is packing .all the trailer use distinct packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer