1.Item parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany kind can be opentional |
tire | 11R22.five/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/nine./eight./8.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
device box | 1 |
air wiring | doule air line |
electric power wiring | six main wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma cutting device reduce the metal to minor components use for suited welding and splicing
two)welding
right after steel reducing process the next step is welding .this procedure the primary operate is beam welding .the leading plate-bottom plate and the
middle plate will be welding with each other . this process will be use submerged arc welding process.this sort of welding is really
unique .its completely employed in I beam welding .following this welding method other areas of the trailer will be use distinct welding way
for distinct metal-argon arc welding-electrical arc welding-manual welding-gas welding and so on
three)blasting
this process is use for the 1st step of area cleanness-pressure reduction-derusting prior to paiting .
four)electrophoresis coating
this method use for much more element surface cleanness
5)epoxy zinc primer spray coating
this process is the lasting one particular prior to paiting .following this procedure the trailer an be paiting
6)assembly
after all the process we have mationed .the very last treatment of the trailer is assembly.this approach all the areas will be assemly .it like tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake technique and so on
seven)packing
The previous method is packing .all the trailer use various packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer
FAQ
one. Does your company have your personal manufacturing unit?
Sure, we are maker,You are welcome to go to our factory at whenever!
2. What is your terms of payment?
T/T with thirty% deposit, and 70% JCPT will be compensated prior to shipping.
We will present you pictures of the merchandise and offers before you paying the JCPT.
3. What is your minimum quantity?
1 established.
4. What is your packing?
Naked packing, we transportation our trailers by bulk cargo provider, ro-ro or forty/forty five HQ or land transportation.
5. How about shipping and delivery time?
Normally speaking, 25 workdays after we received 30% of deal price T/T down payment. The particular shipping and delivery time depends on the products and the amount of your purchase.