1.Item parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany kind can be opentional |
tire | 11R22.five/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./8./eight.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | 1 |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma reducing device minimize the metal to tiny components use for ideal welding and splicing
2)welding
following metal chopping procedure the following stage is welding .this procedure the major perform is beam welding .the best plate-base plate and the
middle plate will be welding collectively . this method will be use submerged arc welding procedure.this kind of welding is extremely
special .its exclusively employed in I beam welding .after this welding process other elements of the trailer will be use different welding way
for various steel-argon arc welding-electric arc welding-guide welding-gasoline welding and so on
3)blasting
this procedure is use for the very first step of floor cleanness-tension aid-derusting ahead of paiting .
4)electrophoresis coating
this process use for far more depth floor cleanness
5)epoxy zinc primer spray coating
this approach is the long lasting a single ahead of paiting .after this approach the trailer an be paiting
6)assembly
right after all the approach we have mationed .the previous process of the trailer is assembly.this procedure all the parts will be assemly .it including tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake method and so on
7)packing
The very last approach is packing .all the trailer use different packing way as JCPTer requirment.soon after packing the trailer can be on the way to the JCPTer