1.Merchandise parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany sort can be opentional |
tire | 11R22.5/12R22.five/11.00R20/12.00R20 brand can be opentional |
wheel rim | 8.twenty five/9./eight./8.5 |
kingpin | two”/3.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: content:Q345B/T700 |
landing gear | jost c200 /fuwa two pace 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
instrument box | 1 |
air wiring | doule air line |
electrical energy wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | complete chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma cutting device reduce the metal to small elements use for appropriate welding and splicing
2)welding
following metal slicing procedure the subsequent phase is welding .this process the major perform is beam welding .the prime plate-base plate and the
middle plate will be welding with each other . this process will be use submerged arc welding method.this type of welding is quite
specific .its completely utilised in I beam welding .right after this welding process other areas of the trailer will be use diverse welding way
for different steel-argon arc welding-electrical arc welding-manual welding-gas welding and so on
three)blasting
this process is use for the very first step of floor cleanness-pressure relief-derusting before paiting .
4)electrophoresis coating
this procedure use for much more detail surface cleanness
5)epoxy zinc primer spray coating
this method is the long lasting a single before paiting .right after this procedure the trailer an be paiting
6)assembly
soon after all the method we have mationed .the last procedure of the trailer is assembly.this approach all the elements will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical energy wiring-brake method and so on
7)packing
The very last approach is packing .all the trailer use different packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer