1.Product parameters
dimension | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany type can be opentional |
tire | 11R22.5/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/9./eight./eight.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
instrument box | 1 |
air wiring | doule air line |
electric power wiring | 6 core wiring24v or 12v LED lamp |
brake program | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
one)cutting
use the plasma reducing machine cut the metal to minor parts use for suited welding and splicing
2)welding
after metal chopping process the subsequent action is welding .this procedure the principal function is beam welding .the best plate-base plate and the
middle plate will be welding with each other . this approach will be use submerged arc welding process.this type of welding is quite
unique .its solely utilised in I beam welding .soon after this welding method other elements of the trailer will be use various welding way
for diverse metal-argon arc welding-electric powered arc welding-handbook welding-gasoline welding and so on
3)blasting
this procedure is use for the 1st action of surface cleanness-stress reduction-derusting ahead of paiting .
4)electrophoresis coating
this procedure use for far more detail surface cleanness
five)epoxy zinc primer spray coating
this process is the long lasting a single before paiting .soon after this approach the trailer an be paiting
six)assembly
soon after all the process we have mationed .the very last process of the trailer is assembly.this method all the elements will be assemly .it which includes tire-wheel rim-king pin-landing gear-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake program and so on
7)packing
The final procedure is packing .all the trailer use various packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer