Tri Axles Gooseneck 13meters Excavator Low Bed Semi 3/4axles 45-sixty Tons Low-Bed JCPT Products Lowbed Truck Semi Trailer
Major Functionality
Item Specification | ||||
one | Sort | Semitrailer | ||
2 | Item Title | Low Bed Semitrailer | ||
3 | Dimension | 13000x3000x1600mm | ||
4 | Tare Excess weight | 9240kg | ||
five | Payload | 41t | ||
six
|
Working Method | Axles | FUWA , BPW, HUAJIN brand name,13t/16t/20t Very good quality axles | |
Suspension | Tri-axle 10-pcs leaf spring suspension with equalizer beam (we can pick the Air suspension depend on JCPTer necessity) |
|||
Tires | Linglong, Double Coin, Triangle brand name 11.00R20/8.25R20/twelve.00R22.five, 12unit | |||
7 | Ladder | Manually operated or JCPT type | ||
8 | Braking Technique | Dual lines pneumatic brake system, WABCO Emergency Relay Valve KORMEE Abdominal muscles braking method |
||
nine | Body | Main Beam | Q345B steel,Height 500, upper 16mm, lower 18mm. Mid web 10mm |
|
Cross Beam | Mild Alloy Q235 | |||
10 | King Pin | Dimension: 50# (2”) or 90#(three.5”) Type: welded or assembled | ||
11 | Landing Gear | FUWA, JOST Brand name Single side operation or double side operation, Static capacity 28Ton |
||
twelve | Electrical & Paint | Electrical | Rear light, rear reflector, turn indicative light, side reflector, fog lamp, number plate light | |
JCPTs & Reflectors | 24V, 7 lines | |||
Portray | zinc-wealthy primer and modified urethane topcoat as JCPTers’ choices. | |||
Add-ons | Resource BOX (BOX ONLY)—Supplied WITH THE TRAILER TWO SPARE WHEEL HOLDER(WINCH),BUT NO SPARE TYRES |
I.The Application and the Technical Highlights:
—The reduced mattress semitrailers are mostly suitable for the MID/Long length transportation of mechanical tools, massive objects, highway building products, huge tanks, electricity plant equipment or machine, and all sorts of steel merchandise.
—The minimal mattress semitrailer can mattress divide into flat bed reduced bed trailer, concave lower bed trailer, tyres look lower bed trailer, tyres protected minimal mattress trailer. The concave minimal bed trailer structured with tyre appeared design, the height of the cargo’s carrying platform from ground is 900mm.-Reduced platform makes the stable transportation.
—The chassis is ladder variety,longitudinal beam part is H-formed. It has good rigidity and substantial energy.
— Higher Good quality Body and higher-tensile steel for heavy loading ability
— BPW, FUWA or Certificated Chinese Axles
—Stomach muscles brake system
—WABCO Vehicle Management System
—JOST ,FUWA or Chinese brand name parking leg and king pin
—Air and Mechanical Suspension
—Bolster the Chassis Instructure
II.The Benefit
***Frame:making use of the advanced assembly welded equipments to weld the area body structure which shaped by welded-kind longitudinal beam (made of 16Mn steel plate) and the total Operate-by means of cross beam.Our take into account the power,stiffness and toughness of the frame and layout the frame is sturdy sufficient to have the heavy cargo.
***Suspension: JCPTweight layout.Substantial-strength materials with robust carrying ability, exceptional wear resistance residence and functionality stability and extended support daily life.Wheel Monitor adjustable easily and correctly, which defend the tires from abnormal dress in.Passed rigorous bench testing and road screening.
***Axle:Specifically processed 1-piece spindle of large top quality lower alloy metal, which possesses powerful loading potential, long lifestyle, gentle weight and outstanding overall performance.High machining precision of the braking system tends to make the braking performance more secure.
III.Innovative Procedure
~~~Style Drawing: Just before generation, we will despatched the design drawing to our JCPTer to affirm the detail of the automobile. We hope we can supply the most suited solution to our JCPTer.
~~~Slicing and Welding: The I beam chopping undertake the Laptop Numerical Handle Plasma Reducing Machine. The I beam welding adopt the Gantry Principal Sill Welding Equipment.
~~~The Beam Welding: Main beam and facet beam all use I-shaped beam, it can ensure the trailer more durable.Strengthened rear plate can stay away from the rear plate was broken away when hefty obligation machines climbing the ramp of trailer.
~~~Area Remedy: In purchase to take away the rust of the trailer human body, we use the sand blasting to retreat the surface area of the trailer.
The trailer can have the gorgeous physical appearance,the portray will be coating evenly, organization adhension, gloss a lot more durable
~~~Portray: 1 layer of the anti-rust portray, two layer of portray
~~~Test: We will take a look at the top quality of the trailer ahead of supply.
IV.The Element of the Reduced Bed Trailer
V. Classification Of The Low Mattress Trailer
VI. Guarrantee For The Elements Of The Low Bed Traielr:
ITEM NAME | Warranty | ITEM NAME | Warranty | |||
MAIN FRAME | Frame | 1 YEAR | RUNNING GEAR | AXLE | 6 MONTHS | |
SUSPENSION | 6 MONTHS | AXLE BEARING | 3 MONTHS | |||
KING PIN | 1 YEAR | WHEEL HUB | 3 MONTHS | |||
BALANCE ARM | 3 MONTHS | |||||
ITEM NAME | Guarantee | ITEM NAME | Warranty | |||
BRAKING DEVICE | BRAKE DRUM | 3 MONTHS | SUPPORT DEVICE | LXIHU (WEST LAKE) DIS. GEAR | 6 MONTHS | |
BRKE CHAMBER | 3 MONTHS | SPARE WHEEL CARRIER | 6 MONTHS | |||
AIR RESERVOIR | 6 MONTHS | |||||
ITEM NAME | Warranty | |||||
Other folks | LEAF SPRING | 3 MONTHS | ||||
BRAKE CHAMBER DIAPHRAGM | 3 MONTHS | |||||
EMERGENCY RELAY VALVE | 3 MONTHS | |||||
BRAKE SHOE | 3 MONTHS | |||||
RELAY VALVE | 3 MONTHS |
VII. Working Method
one. You deliver us an inquiries on your wanted trailer by means of our speak to info.
two. We shall reply you in 12 hours after we acquired our inquiry.
3. We will negotiate the depth of the trailer on your need.
four. Verified on the tech data.
five. Sign agreement.
six.30% down payment or LC issuing.
seven. Production
eight. The Manufacturig process with updated information.
nine. The Generation completement.
ten.Balance payment .
11.Prepare Cargo and Custom made Clearance
twelve. A/S services for 1 year.