1.Item parameters
size | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american sort/germany type can be opentional |
tire | 11R22.5/12R22.five/eleven.00R20/12.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./eight./eight.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
tool box | 1 |
air wiring | doule air line |
electricity wiring | six core wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma reducing machine minimize the steel to tiny components use for suited welding and splicing
2)welding
following metal cutting approach the following step is welding .this approach the main work is beam welding .the best plate-base plate and the
middle plate will be welding jointly . this procedure will be use submerged arc welding method.this kind of welding is quite
particular .its exclusively employed in I beam welding .right after this welding process other elements of the trailer will be use diverse welding way
for different metal-argon arc welding-electric powered arc welding-manual welding-gasoline welding and so on
3)blasting
this method is use for the 1st step of surface area cleanness-anxiety aid-derusting just before paiting .
four)electrophoresis coating
this method use for far more detail area cleanness
five)epoxy zinc primer spray coating
this approach is the lasting a single prior to paiting .right after this method the trailer an be paiting
6)assembly
following all the approach we have mationed .the previous process of the trailer is assembly.this method all the areas will be assemly .it such as tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake program and so on
seven)packing
The previous process is packing .all the trailer use various packing way as JCPTer requirment.following packing the trailer can be on the way to the JCPTer