1.Solution parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany variety can be opentional |
tire | 11R22.5/12R22.5/11.00R20/12.00R20 brand can be opentional |
wheel rim | eight.25/9./eight./eight.5 |
kingpin | 2″/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: material:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
flooring | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | 2 pcs |
device box | one |
air wiring | doule air line |
electricity wiring | six main wiring24v or 12v LED lamp |
brake technique | wabco relay valvedrum braket30/30 brake chamber |
paiting | full chassis sand blastingelectrophoresis coating1 coat of anticorrosive primary 2 coats of closing paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
one)cutting
use the plasma chopping device minimize the metal to tiny elements use for suitable welding and splicing
two)welding
soon after steel chopping procedure the up coming phase is welding .this approach the primary operate is beam welding .the prime plate-bottom plate and the
middle plate will be welding jointly . this method will be use submerged arc welding process.this kind of welding is really
special .its solely used in I beam welding .soon after this welding process other areas of the trailer will be use various welding way
for various steel-argon arc welding-electric arc welding-guide welding-fuel welding and so on
3)blasting
this process is use for the 1st action of floor cleanness-anxiety reduction-derusting before paiting .
four)electrophoresis coating
this procedure use for more element floor cleanness
five)epoxy zinc primer spray coating
this process is the lasting a single ahead of paiting .right after this procedure the trailer an be paiting
six)assembly
following all the process we have mationed .the previous procedure of the trailer is assembly.this process all the parts will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electricity wiring-brake technique and so on
7)packing
The previous approach is packing .all the trailer use diverse packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer