one.Solution parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american kind/germany kind can be opentional |
tire | 11R22.five/12R22.5/eleven.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.25/nine./8./eight.5 |
kingpin | two”/three.five” |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: substance:Q345B/T700 |
landing gear | jost c200 /fuwa two velocity 28ton |
floor | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
resource box | one |
air wiring | doule air line |
electricity wiring | 6 core wiring24v or 12v LED lamp |
brake method | wabco relay valvedrum braket30/30 brake chamber |
paiting | total chassis sand blastingelectrophoresis coating1 coat of anticorrosive key 2 coats of last paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
two.Normal Procedure
1)cutting
use the plasma slicing equipment reduce the metal to tiny areas use for ideal welding and splicing
2)welding
following steel reducing process the following stage is welding .this approach the primary perform is beam welding .the leading plate-bottom plate and the
middle plate will be welding jointly . this process will be use submerged arc welding process.this sort of welding is very
particular .its exclusively used in I beam welding .after this welding method other parts of the trailer will be use distinct welding way
for distinct steel-argon arc welding-electric arc welding-manual welding-gasoline welding and so on
three)blasting
this method is use for the 1st step of floor cleanness-tension aid-derusting before paiting .
4)electrophoresis coating
this procedure use for much more detail surface area cleanness
5)epoxy zinc primer spray coating
this method is the long lasting 1 prior to paiting .after this method the trailer an be paiting
6)assembly
following all the procedure we have mationed .the previous procedure of the trailer is assembly.this method all the parts will be assemly .it which includes tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electrical power wiring-brake program and so on
7)packing
The previous procedure is packing .all the trailer use diverse packing way as JCPTer requirment.after packing the trailer can be on the way to the JCPTer