1.Product parameters
dimensions | 13000mm*2550*3440 |
payload | 60ton |
tare weight | 7000kg |
axle | 3x13ton/14ton/16ton/20ton brand can be opentional |
suspension | mechanical suspension/air suspension/american type/germany variety can be opentional |
tire | 11R22.five/12R22.five/11.00R20/twelve.00R20 brand can be opentional |
wheel rim | eight.twenty five/nine./8./8.5 |
kingpin | 2″/three.5″ |
I beam | up:14mmbottom:16mmmiddle:8mmheight:500mmwidth:140mm: materials:Q345B/T700 |
landing gear | jost c200 /fuwa two speed 28ton |
ground | 3mm checkered plate |
twist lock | Optional |
spare tire carrier | two pcs |
tool box | one |
air wiring | doule air line |
electrical power wiring | six main wiring24v or 12v LED lamp |
brake system | wabco relay valvedrum braket30/thirty brake chamber |
paiting | comprehensive chassis sand blastingelectrophoresis coating1 coat of anticorrosive prime 2 coats of ultimate paiting |
colour | Optional |
accessories | brake shoespare tire crankingshaft head wrenchjack 50tontire boltlamp |
2.Normal Procedure
1)cutting
use the plasma chopping equipment reduce the metal to minor areas use for suitable welding and splicing
two)welding
following steel cutting process the next action is welding .this procedure the main operate is beam welding .the prime plate-bottom plate and the
middle plate will be welding jointly . this procedure will be use submerged arc welding process.this sort of welding is really
unique .its completely utilized in I beam welding .following this welding process other parts of the trailer will be use various welding way
for diverse steel-argon arc welding-electric arc welding-manual welding-fuel welding and so on
three)blasting
this approach is use for the initial stage of surface area cleanness-anxiety aid-derusting just before paiting .
4)electrophoresis coating
this process use for more element area cleanness
five)epoxy zinc primer spray coating
this procedure is the lasting 1 ahead of paiting .following this approach the trailer an be paiting
6)assembly
following all the procedure we have mationed .the final treatment of the trailer is assembly.this approach all the components will be assemly .it like tire-wheel rim-king pin-landing equipment-suspension-spring leaf -brake chamber-air wiring-electric power wiring-brake method and so on
seven)packing
The final procedure is packing .all the trailer use different packing way as JCPTer requirment.right after packing the trailer can be on the way to the JCPTer